SR 507 from Malabar Road to Palm Bay Road

Brevard County

The Florida Department of Transportation (“FDOT”) is currently in the Design phase of a project to widen SR 507 (Babcock Street) from north of Malabar Rd to Palm Bay Road, a length of about 2.5 miles. The project will widen SR 507 from the existing 4 lanes to a 6 lane roadway. Design should be completed before the end of 2018. Right-of-way has been budgeted for $40 million. Construction is expected to cost $23.5 million and has not yet been scheduled.

Project Link:

FDOT Project Info

(For a property owner list, project schedule, or detailed funding information, please contact our office by clicking here)

 

Maguire Lassman, P.A., a Florida law firm that represents property owners faced with the potential acquisition of their property through eminent domain, has access to Brevard County’s Right-of-Way maps. If you own property in Brevard County that may be affected by the SR 507 from Malabar Road to Palm Bay Road project and you have any questions or concerns about Brevard County’s recently released maps or Florida eminent domain law, please contact Maguire Lassman, P.A.’s office manager, Teri L. Alligood, by email at Teri@Maguire-EminentDomain.com or by telephone at (888) 216-6870.

 

more information

For a property owner list, project schedule, or detailed funding information:

contact us