Wekiva Parkway Section 7A

Seminole County

The Florida Department of Transportation (“FDOT”) has completed the design for building 3.53 miles of limited access toll road largely along the existing State Road 46 corridor from a half mile east of Wekiva Park Drive to Orange Boulevard. The project will include non-tolled, service roads for local travel, slip ramps to enter and exit the Wekiva Parkway, and several bridges over side streets. FDOT has budgeted $61.5 million for right of way acquisition. Construction is scheduled to began in April 2018 and is anticipated to be completed in 2022.

Project Link:

Wekiva Parkway Project Description

(For a property owner list, project schedule, or detailed funding information, please contact our office by clicking here)

 

Maguire Lassman Silberngael, P.A., a Florida law firm that represents property owners faced with the potential acquisition of their property through eminent domain, has access to governmental Right-of-Way maps. If you own property in a proposed project corridor and you have any questions or concerns regarding same or general eminent domain law, please contact Maguire Lassman Silbernagel, P.A.’s office by emailing at Ben@Maguire-EminentDomain.com or by telephone at (407)-228-9522.

 

more information

For a property owner list, project schedule, or detailed funding information:

contact us