The Florida Department of Transportation (“FDOT”) has completed the design for building 3.53 miles of limited access toll road largely along the existing State Road 46 corridor from a half mile east of Wekiva Park Drive to Orange Boulevard. The project will include non-tolled, service roads for local travel, slip ramps to enter and exit the Wekiva Parkway, and several bridges over side streets. FDOT has budgeted $61.5 million for right of way acquisition. Construction is scheduled to began in April 2018 and is anticipated to be completed in 2022.
Project Link:
Wekiva Parkway Project Description
(For a property owner list, project schedule, or detailed funding information, please contact our office by clicking here)
Maguire Lassman Silberngael, P.A., a Florida law firm that represents property owners faced with the potential acquisition of their property through eminent domain, has access to governmental Right-of-Way maps. If you own property in a proposed project corridor and you have any questions or concerns regarding same or general eminent domain law, please contact Maguire Lassman Silbernagel, P.A.’s office by emailing at Ben@Maguire-EminentDomain.com or by telephone at (407)-228-9522.